Home
Resources
Follow portfolio news
...

Infraneo's expertise to help repair the Oise Bridge

Published on
12/2/2025
Amended on
23/3/2026
0
minute(s)
Odyssey 2021
Infraneo
Infraneo, a major player in European engineering and present in the Vintage Altaroc Odyssey 2021, supports public and private players in the management of their infrastructures. Specializing in the diagnosis and maintenance of structures, the company draws on its expertise in soil engineering, the water cycle, inspection and testing, and structural engineering. With 18 agencies in France and Europe, Infraneo puts its know-how to work in the service of infrastructure safety and sustainability.
By
Charles Pinsolle
Charles Pinsolle
Infraneo's expertise to help repair the Oise Bridge
This article has been automatically translated. Please excuse any inaccuracies or translation errors.
Dieser Artikel wurde automatisch übersetzt. Bitte entschuldigen Sie etwaige Ungenauigkeiten oder Übersetzungsfehler.
Questo articolo è stato tradotto automaticamente. Ci scusiamo per eventuali inesattezze o errori di traduzione.

In this context, the commune of Demi-Quartier (in the Auvergne-Rhône-Alpes region) commissioned Infraneo to manage the repair work on the Pont de l'Oise, a masonry structure presenting major structural disorders.

In-depth diagnosis for targeted action

Before starting the work, Infraneo's teams carried out a detailed inspection of the bridge to identify the pathologies affecting the structure. The survey revealed seepage weakening the structure, damage to the roadway compromising user safety, deformation of the masonry requiring consolidation, and corrosion of the metal tie rods jeopardizing the stability of the structure. The study also revealed a gap between the spandrel and the return walls, caused by the thrust of the embankment and the deterioration of the masonry.

Technical solutions to ensure the bridge's longevity

To guarantee the durability of the structure and limit future interventions, Infraneo implemented several solutions. The work involved filling certain parts of the bridge with concrete and creating a reinforced concrete cover slab. Surface waterproofing was installed to limit seepage, and the railings were replaced to enhance user safety. The metal tie rods were removed and the masonry consolidated, while the joints were completely rebuilt to improve cohesion. Finally, the tympanum and return walls were rebuilt to stabilize the structure for the long term.

This project, carried out by teams from the Infraneo Lyon - Saint-Georges-de-Reneins branch, illustrates the Group's commitment to preserving and modernizing infrastructures with a view to sustainability and safety.

Other episodes on this topic

Explore our content collections, which bring together different formats around a single subject/issue/theme.
No articles in this category yet.
No items found.
Europe
Services
Welcome to Altaroc
To provide you with a tailored experience, we invite you to complete your profile.
Your profile
country of tax residence
Select
choosenCountry
Preferred language
Select
choosenLang
Your investor profile
Financial intermediary or Professional investor
Financial advisors, wealth management advisors, private bankers, or any other investment service providers.
Qualified Investor or Altaroc Investor
Experienced Investor or Altaroc Investor
Private investors who have already invested in Altaroc who have a minimum investment capacity of €100,000.
Private investors who have already invested in Altaroc who have a minimum investment capacity of €250,000.
Inexperienced investor
Individual investors with an investment capacity of less than €100,000.
Individual investors with an investment capacity of less than €250,000.
Institutional investor
Pension funds, retirement funds, asset management firms, and single-family offices.
Scroll down to accept General Terms and Conditions
The webpage you are trying to access is not available in your country.